Minutes:10 JUL 2024 Members Meeting Agenda: Difference between revisions
Jump to navigation
Jump to search
Initial draft based on last month's |
No edit summary |
||
(8 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
Meeting begins: | Meeting begins: 1912 | ||
Meeting ends: | Meeting ends: 1932 | ||
Participants: David G., Joe D., Brian J., Jame K. | |||
Line 33: | Line 34: | ||
***Remaining needs for exterior door: | ***Remaining needs for exterior door: | ||
****Ethernet terminated properly, fix wiring from controller to strike, camera needs mounted and wired. Still in progress; ETA sometime later in June? - Nate Y. | ****Ethernet terminated properly, fix wiring from controller to strike, camera needs mounted and wired. Still in progress; ETA sometime later in June? - Nate Y. | ||
**Bylaw review needed? (some time this year?) - Jame K. offering to advise/provide info | |||
**LaunchX - July 1st-26th - Joe D. | |||
***going fine | |||
***waiver signed | |||
***red/yellow/green safety system implemented | |||
**Bylaw review needed? (some time this year?) | |||
**LaunchX | |||
*** | |||
*** | |||
*** | |||
**Lathe - Robyn D. | **Lathe - Robyn D. | ||
***large/capable machine | ***large/capable machine | ||
Line 54: | Line 49: | ||
***board approves | ***board approves | ||
***Joe can write a check or provide cash | ***Joe can write a check or provide cash | ||
**Sticker re-order? - David G. | **Sticker re-order? - David G. | ||
***5/10/2022 order was $222.17-33.33=$200.17 for 500 3x3 die cut circles (Sticker Giant) | ***5/10/2022 order was $222.17-33.33=$200.17 for 500 3x3 die cut circles (Sticker Giant) | ||
***current inventory level? | ***current inventory level? | ||
***new design? Sarah B. | ***new design? Sarah B. | ||
*Financial: | *Financial: | ||
**Financial Position: https://drive.google.com/file/d/ | **Financial Position:https://drive.google.com/file/d/14m82r9e1gKDtdKT5KuiqwjPiuTeSEFvm/view?usp=sharing | ||
**Financial Activity: https://drive.google.com/file/d/ | **Financial Activity:https://drive.google.com/file/d/1Z8KQZ6jrwwvAnHHwizNHRvWnMW2XuWEZ/view?usp=sharing | ||
**Monthly financial report https://docs.google.com/spreadsheets/d/1fCZ2j8G5ZXTxQlR_fnR_BoUldrVSsgBDnbztHpAYgGw/edit?usp=sharing | **Monthly financial report https://docs.google.com/spreadsheets/d/1fCZ2j8G5ZXTxQlR_fnR_BoUldrVSsgBDnbztHpAYgGw/edit?usp=sharing | ||
**LaunchX set up, ability to get paid, etc. | |||
**Accountant/tax advice/Payroll solutions - Joe D. | **Accountant/tax advice/Payroll solutions - Joe D. | ||
***Joe's solution: try doing paperwork ourself with payroll service. Switch to CPA if its overwhelming; needs review (fwded to board) | ***Joe's solution: try doing paperwork ourself with payroll service. Switch to CPA if its overwhelming; needs review (fwded to board) | ||
Line 95: | Line 72: | ||
***Nate tried to get an account set up to repay this, but the SBA is asking him to email or fax his SSN and driver license to them on official letterhead. Faxing seems the least-worst of the two options, but need to locate a fax machine or other service to do it. | ***Nate tried to get an account set up to repay this, but the SBA is asking him to email or fax his SSN and driver license to them on official letterhead. Faxing seems the least-worst of the two options, but need to locate a fax machine or other service to do it. | ||
***Joe D. will take the lead on figuring out and faxing as required | ***Joe D. will take the lead on figuring out and faxing as required | ||
*Membership: | *Membership: | ||
**Membership tracking | **Membership tracking | ||
Line 107: | Line 80: | ||
**Customer Relationship Management (CRM) options - Sarah B. | **Customer Relationship Management (CRM) options - Sarah B. | ||
***TechSoup Discount Options | ***TechSoup Discount Options | ||
****CitySoft | ****CitySoft - Jame K. to coordinate demo scheduling | ||
*****Choose your own pricing. Small plan (50-75/mo) probably good enough | *****Choose your own pricing. Small plan (50-75/mo) probably good enough | ||
*****Discount seems to be for medium or large tiers, so may not even be needed | *****Discount seems to be for medium or large tiers, so may not even be needed | ||
Line 129: | Line 102: | ||
****Will start January 1st | ****Will start January 1st | ||
***SPARK cooperation, can we give them more bang for their buck? - David G. | ***SPARK cooperation, can we give them more bang for their buck? - David G. | ||
***Knight Foundation grant? Jame K/Joe D. | |||
**Upcoming events: | **Upcoming events: | ||
***A2Zero week - June 9th-14th https://www.a2gov.org/departments/sustainability/Newsletter-Events/a2zero-week/Pages/default.aspx<nowiki/>-- various circular economy-themed events around Ann Arbor | ***A2Zero week - June 9th-14th https://www.a2gov.org/departments/sustainability/Newsletter-Events/a2zero-week/Pages/default.aspx<nowiki/>-- various circular economy-themed events around Ann Arbor | ||
Line 139: | Line 113: | ||
****Let's come up with some activity ideas (CNC portraits on a postcard? others?). | ****Let's come up with some activity ideas (CNC portraits on a postcard? others?). | ||
*****donations? | *****donations? | ||
**Future goals & pitch deck - Sarah B. | **Future goals & pitch deck - Sarah B. | ||
***Come up with 3-5 year goals for the pitch deck | ***Come up with 3-5 year goals for the pitch deck | ||
Line 161: | Line 134: | ||
***form own sub-committee? | ***form own sub-committee? | ||
**Bonus: DIY fob/badge idea | **Bonus: DIY fob/badge idea | ||
**Miniatures class - | **Miniatures class - details/status update required (grant was 9 months ago) - or pivot? - Victoria W. | ||
**Artisan Market events - | **Artisan Market events - | ||
***Starting April 28th with cardboard Swords and Wands (approved). Joe D. is running this activity. | ***Starting April 28th with cardboard Swords and Wands (approved). Joe D. is running this activity. |
Latest revision as of 18:33, 10 July 2024
Meeting begins: 1912
Meeting ends: 1932
Participants: David G., Joe D., Brian J., Jame K.
Agenda
- Announcements/new business - 10m
- Operations
- Financial
- Membership
- Outreach
- Education
Minutes
- Announcements/new business:
- Operations:
- PC upgrades:
- still need something for laser? (e.g. cheap Amazon option)
- need something for CNC
- Robyn has dispo leads
- Access control (interior and exterior): - Nate Y. (see also Trello)
- camera, door connected, not sure if implemented?
- Mike might test tonight
- Interior door is good to go -- could use some wiring cleanups (will be easy once we remove the legacy system)
- Timeline to sunset the legacy entrance system? How do we make this clean so members who haven't been around in a while don't get locked out? Member news blast, reminders to meet Nate/others who have been trained on how to add users at Repairsdays/Open Hours, any other things?
- need to send an email to members of impending change and how to get access
- Timeline to sunset the legacy entrance system? How do we make this clean so members who haven't been around in a while don't get locked out? Member news blast, reminders to meet Nate/others who have been trained on how to add users at Repairsdays/Open Hours, any other things?
- Remaining needs for exterior door:
- Ethernet terminated properly, fix wiring from controller to strike, camera needs mounted and wired. Still in progress; ETA sometime later in June? - Nate Y.
- camera, door connected, not sure if implemented?
- Bylaw review needed? (some time this year?) - Jame K. offering to advise/provide info
- LaunchX - July 1st-26th - Joe D.
- going fine
- waiver signed
- red/yellow/green safety system implemented
- Lathe - Robyn D.
- large/capable machine
- ferrus-capable
- good candidate for pairing w/ desktop vertical milling
- ideal for classes
- safer
- could retain existing for reference
- asking $650
- board approves
- Joe can write a check or provide cash
- Sticker re-order? - David G.
- 5/10/2022 order was $222.17-33.33=$200.17 for 500 3x3 die cut circles (Sticker Giant)
- current inventory level?
- new design? Sarah B.
- PC upgrades:
- Financial:
- Financial Position:https://drive.google.com/file/d/14m82r9e1gKDtdKT5KuiqwjPiuTeSEFvm/view?usp=sharing
- Financial Activity:https://drive.google.com/file/d/1Z8KQZ6jrwwvAnHHwizNHRvWnMW2XuWEZ/view?usp=sharing
- Monthly financial report https://docs.google.com/spreadsheets/d/1fCZ2j8G5ZXTxQlR_fnR_BoUldrVSsgBDnbztHpAYgGw/edit?usp=sharing
- LaunchX set up, ability to get paid, etc.
- Accountant/tax advice/Payroll solutions - Joe D.
- Joe's solution: try doing paperwork ourself with payroll service. Switch to CPA if its overwhelming; needs review (fwded to board)
- Artisan market starts 4/7
- Setup will be a big job either way. Management may not be that much work.
- This needs at least two people.
- https://docs.google.com/document/d/15guo7zZOTvUhtWUuEZ3JxxUewXUzQSMBxMrQysdqxFo/edit?usp=sharing
- Joe's solution: try doing paperwork ourself with payroll service. Switch to CPA if its overwhelming; needs review (fwded to board)
- Taxes all done for 2023, how-to process updated on the wiki here: Finances#Taxes
- Jame K. to add further info from screen-share on how to do Sales Tax?
- What to do about 2025 rent negotiations with Oxford? - Nate Y.
- Latest proposal: five-year lease, one month rent abatement, $12.68/sqft/yr. with $0.50/sqft/yr. increase each year after the first. Last chance for discussion/input!
- SBA disaster loan repayments starting in October, need to make sure more than just Nate is aware of how to do this - Nate Y.
- Nate tried to get an account set up to repay this, but the SBA is asking him to email or fax his SSN and driver license to them on official letterhead. Faxing seems the least-worst of the two options, but need to locate a fax machine or other service to do it.
- Joe D. will take the lead on figuring out and faxing as required
- Membership:
- Membership tracking
- Nate set up Appsmith
- need more server - Nate Y.
- Jame K. not ready
- Nate set up Appsmith
- Follow-up/Tickler system?
- Customer Relationship Management (CRM) options - Sarah B.
- TechSoup Discount Options
- CitySoft - Jame K. to coordinate demo scheduling
- Choose your own pricing. Small plan (50-75/mo) probably good enough
- Discount seems to be for medium or large tiers, so may not even be needed
- All inclusive price; all modules, upgrades, support avenues, data import, backups included
- Springly
- Discount looks like it includes the Professional tier features
- Pricing jumps after first year; not clear if you can repeat the discount but it seems like you can
- Pricing also increases per number of members, but the cap is high (for us) at 250 members
- Pro tier 119/149, Serenity tier 45/79
- CitySoft - Jame K. to coordinate demo scheduling
- Truly free options
- CiviCRM:
- Caveat is that some of the modules we might need could have a cost associated
- CiviCRM:
- Next step:
- Consider what features we actually need
- Learn more about the install/set up process & learning curves
- Goal: Balance cost - ease of use - efficacy
- TechSoup Discount Options
- Membership tracking
- Outreach:
- Future grants?
- Free-form MEDC grant - Jame K./Ben N.
- SA2T (Sustaining Ann Arbor Together) - Sarah B./Nate Y.
- Will start January 1st
- SPARK cooperation, can we give them more bang for their buck? - David G.
- Knight Foundation grant? Jame K/Joe D.
- Upcoming events:
- A2Zero week - June 9th-14th https://www.a2gov.org/departments/sustainability/Newsletter-Events/a2zero-week/Pages/default.aspx-- various circular economy-themed events around Ann Arbor
- Will be hosting extended Repairsday hours on 6/13 (5pm-9pm), and stamping visitors' A2zero passports
- A2 Summer Fest Annex tent on the evening of 6/15 -- tentatively doing solar-powered CNC portraits, although lighting under the tent was an issue last time. If we want to do something else, need to decide before 5/1!
- Need to finalize staffing for both events.
- Art Fair (July 18th-20th @ E. Liberty St. close to AHA)
- up to dual 6'x6' booths
- Create staffing schedule
- Let's come up with some activity ideas (CNC portraits on a postcard? others?).
- donations?
- A2Zero week - June 9th-14th https://www.a2gov.org/departments/sustainability/Newsletter-Events/a2zero-week/Pages/default.aspx-- various circular economy-themed events around Ann Arbor
- Future goals & pitch deck - Sarah B.
- Come up with 3-5 year goals for the pitch deck
- use long term planning channel for brainstorming -- Sarah B. will seed with gathered ideas
- schmooze cruise - everyone reach out to 3 people and ask for donations, and/or attend events to promote AHA! and our fundraiser
- Cahoots - Jame K.
- very 2-3 happy hours
- Bob Ross-style soldering workshop (leverage PCBway sponsorship)
- other workshops where knowledge workers can use hands instead
- discounted memberships/annual donation
- 2-3 access cards for staff after orientation in exchange for use of their event space(s)
- Workantile - Jame K.
- Bamboo - Jame K.
- Newsletter owners needed
- Tango tutorials on hold pending migration to Sendy - Sarah B.
- Sendy/AWS - Nate Y., Jame K., Sarah B.
- Future grants?
- Education:
- 2024 education goals/classes
- How to transfer some responsibilities for classes to more people?
- form own sub-committee?
- Bonus: DIY fob/badge idea
- Miniatures class - details/status update required (grant was 9 months ago) - or pivot? - Victoria W.
- Artisan Market events -
- Starting April 28th with cardboard Swords and Wands (approved). Joe D. is running this activity.
- next is 6/23 (take and make earrings)
- Need to hire help for later events
- Starting April 28th with cardboard Swords and Wands (approved). Joe D. is running this activity.
- Repairsday Road Show/Community Outreach/A2Zero ambassadors
- Computer Club?
- 2024 education goals/classes
- Communications improvements