Minutes:08 Feb 2017 Board Meeting Agenda: Difference between revisions

From All Hands Active Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 24: Line 24:
==Minutes Approval==
==Minutes Approval==


* October 2016 Board Minutes.
* December 2016 Board Minutes.
* November 2016 Board Minutes.
* January 2016 Board Minutes.
 
Approved both!


==(90min) Standing Committee Reports==
==(90min) Standing Committee Reports==
Line 33: Line 31:
==Education - Nate Y.==
==Education - Nate Y.==


STEM / OpenSCAD @ Quicken loans - Went well and raised awareness of hackerspaces in SE Michigan.
3D printer class slides need to be updated. -- Alex W. is going to try to get fixes for 3D printers last month
 
Nick - OnShape class shelved for now.
 
3D printer class slides need to be updated. -- Alex W. is going to try to get fixes for 3D printers this week.


Based on October's policy, we owe Josh $15 for hosting the October Arduino class. Alex will ask Lauren how to record it. Alex is checking with Lauren tomorrow.
Josh decided to make the $15 we owe him for October Arduino a donation. Alex was going to ask Lauren how to record it if we did pay him. What was the result?w.


Did we get back to Brain Monkeys? Yes, Nate is going to reach out to Katie again and see if she's still interested.
Did we get back to Brain Monkeys? Nate was going to reach out to Katie again and see if she's still interested. Result?


Nate Y was going to schedule an education meeting around mid-January, shelved it. Teachers are really board members and so he decided not to host it yet. We need to figure out how to get more teachers and advertise it as a space people can rent. We should decide on cost and how it works if you are a member. Rental fee, and we need to have a volunteer here. How do we handle charges. Tyler will start email with ideas in it by Saturday.
Tyler sent an email about the rental fee for the board@allhandsactive.org address on 1/12. Sent reminder to respond on 1/27.  


Previous:
Previous:
* FreeNet - 15 people
* Laser - 5 people
* OpenSCAD - 2
* 3D Printer - 5
* Inkscape - 1
* Amateur Radio  
* Amateur Radio  
* PCB Making
Upcoming:
Upcoming:
* Laser class
* CNC class
* 3D printing
* Root Kits
* Root Kits
* KiCad PCB class
* Cryptoparty
* Amateur Radio
* Amateur Radio


Line 61: Line 53:


==Finances/Membership - Alex W.==
==Finances/Membership - Alex W.==
ATT transfered to AHA card.


Rerun is setup - Lets us handle recurring payments using credit card and feeds into Xero! All setup and we'll be using it for Spark. This lets us handle when we can't use Paypal for people without accounts.
Rerun is setup - Lets us handle recurring payments using credit card and feeds into Xero! All setup and we'll be using it for Spark. This lets us handle when we can't use Paypal for people without accounts.


4500 dollars in the bank. Rent was paid already for this month by check. Will it go up in Jan with the new space? Slightly profitable at the moment. Not burning!
x dollars in the bank. Will it go up in Jan with the new space? Slightly profitable at the moment. Not burning!


Nate will put a button to pay for class!
Nate will put a button to pay for class?


DTE meter issue. Alex got a call back. Alex needs to get meter numbers from Kelly to get payment taken care of.
DTE meter issue. Alex got a call back. Alex needs to get meter numbers from Kelly to get payment taken care of.


ATT needs to be transferred still.
Members - Alex needs to count members yet.  *** From Greg.  Please update when you can. It would be nice to have a monthly report of +/- Change in Members per month, and a break down of what these members are (paid, student, volunteer).  


Members - Added 5 new, Alex needs to count members yet. members still.  *** From Greg.  Please update when you can. It would be nice to have a monthly report of +/- Change in Members per month, and a break down of what these members are (paid, student, volunteer).
The electronic membership form, mostly finished. Tyler got it up on the website and we've been tweaking it.
 
The electronic membership form, finished! Alex will send link to Tyler and he'll get it on the website.  


Tax - Alex working with Lauren to resolve fine issue. Waiting on reply from Michigan sales tax. He's talking to Lauren tomorrow.
Tax - Alex working with Lauren to resolve fine issue. Waiting on reply from Michigan sales tax. He's talking to Lauren tomorrow.
Line 89: Line 81:
Partially related to AHA.  Backyard Brains received good scores on an NIH grant that calls for an injection molding machine to be purchased. We could even justify getting a nice CNC mill to make molds. Grant will be known in March/April timeframe.
Partially related to AHA.  Backyard Brains received good scores on an NIH grant that calls for an injection molding machine to be purchased. We could even justify getting a nice CNC mill to make molds. Grant will be known in March/April timeframe.


==Marketing/Events - ???==
==Marketing/Events - Unstaffed ==


=== Marketing Corey Updates ===
* Maker Faire - Needs come up with ideas for next year and float them to members. Tyler sent email to the list on 1/27 to check if people have ideas. If not, we will not be having a booth this year.
* Maker Faire - Needs come up with ideas for next year and float them to members. ETA is 11/14.
* Adam is still at work on sandwich board sign. Tyler will check back again with him in late Feb.
 
* Kim finished signage for front of building. Tyler sent files to printer. ETA is early Feb.
=== Marketing Adam Funk Helps! ===
* Need to find time to cut vinyl for magnet sheet for inside. Tyler will order magnet sheet
* Will on sandwich boards - Tyler contacted him.
* Tyler had sign printed for back door - Needs to mount
 
* Will think about how to improve signage around the space.


=== Google Adwords ===  
=== Google Adwords ===  
* Alex met with Greg and Google Marketing
* Alex met with Greg and Google Marketing
* Need to add more keywords
* Need to add more keywords
* New campaigns we can run.
* New campaigns we can run.
* Nate suggests google docs!
* Nate suggests google docs!


=== Marketing Greg Updates ===
=== Marketing Greg Updates ===


Jan 2017 Email:
Feb 2017 Email:
Currently 186 Total Audience on email.  Will send on Jan 12.  Will try to do 1st every month.  Nate Y. working with Florencia E. on a monthly newsletter.  Will be posting sending a note out to those who would wish to sign up via Meetup by this weekend.  Already posted it on Facebook places -- will continue to do so every month.
Currently ? Total Audience on email.  Will send on Feb 1st.  Nate Y. working with Florencia E. on a monthly newsletter.  


==Operations/Volunteers - Tyler W.==
==Operations/Volunteers - Tyler W.==


Fishtank moved!
1 Hakko returned from Erik, now have 3.
 
Erik's parents formally donated the miter saw.
 
1 Sewing machine returned. 1 still in need of repair


Greg covered a new Nest Subscription.
Larry fixed door stop for loud room.


Bought 2 new Hakko Solder Stations
Moved desk to Annex, capped pipes, mounted white board, Brian fixed track lights, sorted fixtures, installed projector, and Nate replaced light bulbs.


Mounted new donation box.
Ordered bench for Electronics area, work begins on 2/2 to construct new one.


Capped pipes in Annex with Nates help!
Picked out tables but need funding to buy them for main space. Home Depot doesn't presently stock them in our area anymore.


Going to order new electronics bench this month.
Nick and Nate continued to work on the door.  


Picked out tables but need funding to buy them for main space.
Website Old - Updating information, simplifying, and removing out dated content. Posted Anti-harassment policy. Swapped for new membership form and simplified membership page.


Website new - Draft is underway, planning to have new design finished by end of Jan with all content. Re-working everything around new color scheme/logo.  
Website new - Collecting photos for stream of projects happening at AHA. Haven't touched the code much as we found more stuff on old site to update before migration. Worked on stripe integration with Alex on 1/29 Source: https://github.com/tsworman/AHA-Website2  
Hosted on GitHub presently, anyone can clone contribute if they want. https://github.com/tsworman/AHA-Website2  


Nick and Nate did work on the door and it's great. Will start working on space across the hall once we know what's up with the Annex and new classroom.
Annex
* Want to find sink, microwave, fridge, and cabinets still.
* Move desks to New classroom, remove crap.


Classroom
Classroom:
* Want to find sink and cabinets still.
* Gave keys to Kelly for Rekey
* Need to move desks there
* Relocate all kits to a rack in there
* Mount projector
* Remove wall
* Relocate Electric covering wall entrance.


Signage  
Signage  
* Greg was going to get in touch with Vanya to fix up door logo, get other signage running. From Greg: it wasn't Vanya, but a chilean designer.  Trying to get into her schedule.  Will try more this month.
* Greg was going to get in touch with Vanya to fix up door logo  From Greg: it wasn't Vanya, but a chilean designer.  Trying to get into her schedule.  Will try more this month.
* After Hours rear stairway sign - Sent to printer for production on corrugated plastic. Need to get mounting hardware.
* After Hours rear stairway sign - Printed need to mount.
* Front of building - Work planned for this weekend.
* Front of building - Design done, sent to printer
* Sandwich board - Bugged Adam on 1/7 to see if he made progress - Haven't heard back.  
* Sandwich board - Heard back from Adam, he still needs more time but is planning to do it still.  


Recycling - We've been collecting in separate box and leaving cans in bags for people to collect outside the dumpster (other tenants do that). We should still get a bucket, but haven't had time.
Recycling - We've been collecting in separate box and leaving cans in bags for people to collect outside the dumpster (other tenants do that). We should still get a bucket, but haven't had time.

Revision as of 10:48, 27 January 2017

AHA Mission Statement
We seek to establish, build, and support a collective of individuals organized around the principles of community-driven education in the arts and sciences, and to ensure ready access to the tools needed to pursue the realization of those principles.

  • Meeting attendees:
  • Meeting starts at:
  • Meeting ends at:

Board Meeting Protocol

* Standing Committee Reports - Individual Updates by Assigned Director/Officer presented in the time allotted.

* Open Time: For anyone to bring anything up to the Board. IF the Board agrees the item requires action, it will be put into New Business and addressed at the end of the meeting.

(15m) Open For All

  • All Are Worthy. All Are Welcome.

Fire Safety - Breaker box behind laser cutter is continually blocked. We need to maintain access to this. We moved the mirrors that were in the way during the meeting, still stuff in breaker closet we need to dispose of. Going to contact landlord on disposal of old bulbs. Need to label breaker closet.

Minutes Approval

  • December 2016 Board Minutes.
  • January 2016 Board Minutes.

(90min) Standing Committee Reports

Education - Nate Y.

3D printer class slides need to be updated. -- Alex W. is going to try to get fixes for 3D printers last month

Josh decided to make the $15 we owe him for October Arduino a donation. Alex was going to ask Lauren how to record it if we did pay him. What was the result?w.

Did we get back to Brain Monkeys? Nate was going to reach out to Katie again and see if she's still interested. Result?

Tyler sent an email about the rental fee for the board@allhandsactive.org address on 1/12. Sent reminder to respond on 1/27.

Previous:

  • Laser - 5 people
  • 3D Printer - 5
  • Amateur Radio
  • PCB Making

Upcoming:

  • CNC class
  • Root Kits
  • Amateur Radio

School in Dexter interested in having us there. Outreach becomes harder to justify running. Maybe we should consider scaling back. Nate says we should start now and put out a call for folks at Detroit.

Finances/Membership - Alex W.

ATT transfered to AHA card.

Rerun is setup - Lets us handle recurring payments using credit card and feeds into Xero! All setup and we'll be using it for Spark. This lets us handle when we can't use Paypal for people without accounts.

x dollars in the bank. Will it go up in Jan with the new space? Slightly profitable at the moment. Not burning!

Nate will put a button to pay for class?

DTE meter issue. Alex got a call back. Alex needs to get meter numbers from Kelly to get payment taken care of.

Members - Alex needs to count members yet. *** From Greg. Please update when you can. It would be nice to have a monthly report of +/- Change in Members per month, and a break down of what these members are (paid, student, volunteer).

The electronic membership form, mostly finished. Tyler got it up on the website and we've been tweaking it.

Tax - Alex working with Lauren to resolve fine issue. Waiting on reply from Michigan sales tax. He's talking to Lauren tomorrow.

Fundraising - Greg G.

Google

We need to submit ideas to Google for community grants. We can ask from $500-$15/$20k They are vague about The limits. But said they'd like to help a lot of people. I'd like to ask for around $10-15k. As the work in writing is roughly equal to $500. We neee project ideas. Google is interested in STEM. We can fairly easily write a High School component to the research being done over the summer that is manager by aHa and works to integrate the greater community into this effort. But I'd like to hear others opinions.

Spark

Spark wants to give us a Credit Card. We are working on PMT system that recharges monthly with simple email/web interface. Spark has teams interested in the space, and one (a drove company) came down in Jan 2017 to tour AHA. This is good news as it means that Spark should continue to invest in us for the near future. Goal with recurring payments is to "set it and forget it".

NIH

Partially related to AHA. Backyard Brains received good scores on an NIH grant that calls for an injection molding machine to be purchased. We could even justify getting a nice CNC mill to make molds. Grant will be known in March/April timeframe.

Marketing/Events - Unstaffed

  • Maker Faire - Needs come up with ideas for next year and float them to members. Tyler sent email to the list on 1/27 to check if people have ideas. If not, we will not be having a booth this year.
  • Adam is still at work on sandwich board sign. Tyler will check back again with him in late Feb.
  • Kim finished signage for front of building. Tyler sent files to printer. ETA is early Feb.
  • Need to find time to cut vinyl for magnet sheet for inside. Tyler will order magnet sheet
  • Tyler had sign printed for back door - Needs to mount

Google Adwords

  • Alex met with Greg and Google Marketing
  • Need to add more keywords
  • New campaigns we can run.
  • Nate suggests google docs!

Marketing Greg Updates

Feb 2017 Email: Currently ? Total Audience on email. Will send on Feb 1st. Nate Y. working with Florencia E. on a monthly newsletter.

Operations/Volunteers - Tyler W.

1 Hakko returned from Erik, now have 3.

Erik's parents formally donated the miter saw.

1 Sewing machine returned. 1 still in need of repair

Larry fixed door stop for loud room.

Moved desk to Annex, capped pipes, mounted white board, Brian fixed track lights, sorted fixtures, installed projector, and Nate replaced light bulbs.

Ordered bench for Electronics area, work begins on 2/2 to construct new one.

Picked out tables but need funding to buy them for main space. Home Depot doesn't presently stock them in our area anymore.

Nick and Nate continued to work on the door.

Website Old - Updating information, simplifying, and removing out dated content. Posted Anti-harassment policy. Swapped for new membership form and simplified membership page.

Website new - Collecting photos for stream of projects happening at AHA. Haven't touched the code much as we found more stuff on old site to update before migration. Worked on stripe integration with Alex on 1/29 Source: https://github.com/tsworman/AHA-Website2

Annex

  • Want to find sink, microwave, fridge, and cabinets still.
  • Move desks to New classroom, remove crap.

Classroom:

  • Gave keys to Kelly for Rekey
  • Need to move desks there
  • Relocate all kits to a rack in there
  • Mount projector
  • Remove wall
  • Relocate Electric covering wall entrance.

Signage

  • Greg was going to get in touch with Vanya to fix up door logo From Greg: it wasn't Vanya, but a chilean designer. Trying to get into her schedule. Will try more this month.
  • After Hours rear stairway sign - Printed need to mount.
  • Front of building - Design done, sent to printer
  • Sandwich board - Heard back from Adam, he still needs more time but is planning to do it still.

Recycling - We've been collecting in separate box and leaving cans in bags for people to collect outside the dumpster (other tenants do that). We should still get a bucket, but haven't had time.

(30m) Unfinished Business

  • Greg would like to have a meta-discussion about board protocols.

- Discussed off list, and filled out a form then never heard anything.

Alex W. - Drafting a Storage / Clean Tabletop Policy - Still working on it. Alec suggests also having a cheap "storage box" solution, you could rent a cardboard box to put your projects in for a limited time. ETA is August 20th. -- Alex has a draft storage policy, and printed out "parking permits" for existing projects. Still working on the locker policy, and amount to charge for longer-term storage.