Minutes:08 Mar 2017 Board Meeting Agenda: Difference between revisions

From All Hands Active Wiki
Jump to navigation Jump to search
Line 148: Line 148:
* Tyler started work on tool aids per Greg's suggestion and brought in frames to mount them in.
* Tyler started work on tool aids per Greg's suggestion and brought in frames to mount them in.


* Picked out tables, have funding. The ones we want are discontinued. We found them at the South Canton Home Depot but need to make a run for them.
* Picked out tables, have funding. Found them at the South Canton Home Depot but need to make a run for them on 2/22.


* CNC CPU is restored. Need backup.
* CNC CPU is restored. Need backup!


* Wall in Annex - Removed Wall After electric is moved, will contact Jason to approve wall removal, remove wall, move desks, and communicate with all teachers.
* Wall in Annex - Removed Wall After electric is moved, will contact Jason to approve wall removal, remove wall, move desks, and communicate with all teachers.

Revision as of 12:38, 22 February 2017

AHA Mission Statement
We seek to establish, build, and support a collective of individuals organized around the principles of community-driven education in the arts and sciences, and to ensure ready access to the tools needed to pursue the realization of those principles.

  • Meeting attendees:
  • Meeting starts at:
  • Meeting ends at:

Board Meeting Protocol

* Standing Committee Reports - Individual Updates by Assigned Director/Officer presented in the time allotted.

* Open Time: For anyone to bring anything up to the Board. IF the Board agrees the item requires action, it will be put into New Business and addressed at the end of the meeting.


(15m) Open For All

  • All Are Worthy. All Are Welcome.

Minutes Approval

  • Feb 2016 Board Minutes

Education - Nate Y.

Room Rental - Posted on Square store the ability for the public to reserve a room for $60 for 4 hours.

Core Class - After the agreed on raise of class cost. Tyler updated the Square store for all classes that were not yet scheduled. The Arduino class on March 4th is the last to fall under the old cost structure. - Need to decide how to reimburse teachers and tax considerations for person attending.


Scheduling classes

  • Nate will try to get schedule on Google Calendar from meetup.

Nate said he would get back to Katie with all details of class

Nate put out a call for help at Penguicon - Report back! Nick and Nate are going to sell completed badges and do embedded systems programming. Daniel was asking for folks to do 3D printing.

Call for Makerfaire Detroit - Little response, need more completed projects to show off. For now we aren't planning to attend. Work on cool projects instead. Nate had another idea for education and little classes and that worked well days before. We could try for that again if people decide they are going.

Previous:

  • Vinyl Cutter -
  • Laser Cutter Class -
  • Cryptoparty - Overflowing! 20+
  • Intro to PCB Surface mount with KiCad -
  • CNC Router
  • Rootkits 101
  • Arduino
  • Amatuer Radio

Upcoming:

  • Egg bot?
  • Swarms, Chaos, and Decentralized networks.

(90min) Standing Committee Reports

Finances/Membership - Alex W.

TCF downtown branch closed on Feb 12th. We need to use another brand now to make deposits.

Greg setup a Stadium Hardware Tax free account.

Membership: - Standard: - Reduced: - Volunteers: 2 - Co-working - Spark: 5 unknown type - BYB: 10 full

Greg sent list of names to board for creating BYB keys. Tyler created accounts, but keys need to be assigned and delivered.

Alex was investigating 2 members for paypal problems. Alex was going to get back to Donnie about Square Cash.

We made: Expenses: In Bank: Emergency fund (in months):

State sales tax, can't find previous forms, unsure how they are filled out in the past. Waiting to hear back from Zack S. We still need to fill out some paperwork.

Wanted to have a meeting to discuss categories for Xero. Greg wants to meet to discuss categories. Wasn't sure where to send re-run information into. Still need to meetup with her. It's on us to ask her.

Re-run is setup - Greg sent out a note about how we can use it to handle recurring payments for cards. Sounds like it's on Finance to setup people to use it for now.

Did we figure out what is up with HumbleBundle and picking AHA as donation spot? Nate needs a voided check to setup paypal giving.

DTE meter issue. Alex got a call back, but waiting on DTE response. Alex needs to get meter numbers from Kelly to get payment taken care of. Tyler forwarded the Estoppel for expansion on 2/20 to Alex. That included meter numbers.

Fundraising - Greg G.

Larry suggested we get in touch with Menlo. We can ask and get in their process. What happened with this?

Google

Made google doc and got 9 ideas that we submitted to Google for community grants. Got a response and sounds like they liked at least one of them. What's the next step? Ask for up to $40k if we have a big enough project.

Spark

Need to figure out how they want to do memberships and what is included with them. Tyler needs this information before he organizes the election.

NIH

Partially related to AHA. IRB was rejected first go, and have a clean bill of health. Waiting and possibly till March 20th. If we get it, $40k in equipment. Update?

Arrow Electronics

Greg has a meeting to setup a non-profit account and get in touch with the right people.

Marketing/Events - Unstaffed

Google Adwords

  • Alex met with Greg and Google Marketing in December.
  • Need to add more keywords/New campaigns we can run.
  • Nate suggests google docs and sent out an email for this during Feb Meeting. What happened to the response?

Marketing Email Updates

  • Feb 2017
  • No email this month, yet.
    • Currently ? Total Audience on email
    • Nate Y. working with Florencia E. on a monthly newsletter.
    • Greg suggested Maker profiles (Example Mike Grube) for our teachers in the news letter.

Operations/Volunteers - Tyler W.

Elections in April - Schedule around penguicon.

Tracking volunteer hours - Tyler sent email with ideas of who to track, how to track, how to manage, who manages on 2/20. Waiting for feedback.

Fire Safety - Breaker box behind laser cutter is continually blocked. We need to maintain access to this. We moved the mirrors that were in the way during the meeting, still stuff in breaker closet we need to dispose of. Going to contact landlord on disposal of old bulbs. Need to label breaker closet.

Tour of space with Stadium Hardware

In progress

  • Contact city about bin we didn't receive and getting processing fund back.
  • Need to track down the SawZall. It appears to be missing along with the blades for it.
  • Sewing machine 1 still in need of repair
  • Nick and Nate continued to work on the door.
  • NAS - Investigated problem with LDAP users not able to change passwords. It's a Synology issue. Have contacted support and am working to resolve it with them. Found other reports of users with the same issue.
  • Internet - ACD can deliver site service. We need to decide on what package and when we want to do it and get back to them.
  • Tyler started work on tool aids per Greg's suggestion and brought in frames to mount them in.
  • Picked out tables, have funding. Found them at the South Canton Home Depot but need to make a run for them on 2/22.
  • CNC CPU is restored. Need backup!
  • Wall in Annex - Removed Wall After electric is moved, will contact Jason to approve wall removal, remove wall, move desks, and communicate with all teachers.

Done this month

Website Old

  • Raised prices of future classes per agreement last month
  • Added ability to pay for rental of classroom.

Annex

  • Got a fridge
  • Larry capped remaining pipes
  • Added outlet
  • Removed extra furniture and some of extra crap.

Main Space

  • Cleaned entire space
  • Reorganized 3D printing
  • Reorganized Craft Room
  • Reorganized Electronics bench

Classroom

  • Removed wall
  • Setup desks and projector.

Signage

  • Front signs and stairway signage installed
  • Larry hung banner on pillar so people know we are in the back.
  • Greg got us a sweet logo, need to get it everywhere.

To Do

Everything still on the operations word doc (non-pressing issues) and these pressing issues:

All

  • Run backups on all machines to NAS.
  • Purchase and mount 2 PoE Ubiquiti Access points. One in between new classroom and Annex and one in back room. Eliminate wireless from the current box.
  • Add second patch panel to rack, we have more than 24 lines with the new classroom and additional access points.
  • Swap switch for 48 port managed vs 24 port un-managed. Bonding ports for faster Wi-fi would be nice even if it is just internal
  • Internet solution - Need to decide what we are doing.
  • 1 Streaming camera for the main space when people are there snapping a photo on a 5 minute basis to display on website.

Annex

  • Want to find sink, microwave, and cabinets/counter still.

Classroom

  • Run ethernet drops
  • Add electric on wall.
  • Clean floor
  • Purge dead/rusted/old computers we don't plan to use.
  • Mount whiteboard
  • Purchase 2nd pack of whiteboard markers for here
  • Setup mold making equipment.
  • Add outlets/light switch
  • Mount projector.
  • Remove wall.

Signage

  • Greg got new logo completed. We agreed on signs about a meter round on each of the spaces (classroom, coworking, maker). We need to get them made on the vinyl cutter and installed.
  • After Hours rear stairway sign. Reprint on aluminum to match existing signage per Kelly.
  • Sandwich board - Heard back from Adam, he still needs more time, but is planning to get it done soon.
  • Downstairs pole signage - Nate wanted to mount a display there, how can we make this happen?

(30m) Unfinished Business

Storage policy

Alex W. - Drafting a Storage / Clean Tabletop Policy -

  • As of Jan - Still working on it.
  • Alex has a draft
  • Alex has printed out parking permits for existing projects
  • Working on Locker policy and amount to charge for long term storage.
  • Alec suggests also having a cheap "storage box" solution, you could rent a cardboard box to put your projects in for a limited time.
  • ETA was August 20th, 2017 -- Should we consider this dead?